Kak Smotatj Schetchik Gaza
X4 M content/news/642258-taksistov-obyazhut-ustanavlivat-schetchik-i-vydavat-chek/. -vklyuchili-schetchik-dlya-krymskogo-titana 2014-10-08T08:37:21Z daily 0.5. Releases/4338-kak-stat-ukrainskim-predprinimatelem 2014-02-14T17:45:58Z.
• 2006-01-01 Sustainable Safety uses a road categorization in which through traffic is concentrated on motorways and other main roads. In residential areas, which have a living, shopping, or work function, through traffic is discouraged by setting a speed limit of 30 km/h, and by speed reducing measures such as • Zarubina, N.E.; Trishin, V.V.; Malyuk, I.A.; Golovach, L.A. 2005-01-01 The researches which have been carried out in the territory by the Kiev region, including 30- km the zone of the Chernobyl NPP showed that major factors influencing levels of the Cs 137 accumulation by mushrooms, are: density of pollution soils by these radionuclides; belonging of mushrooms to the certain ecological group; depth of localization in soil mycelium of each kind. (authors) • Sich, A.R. 1996-01-01 The first Westerner to live and work with the scientists of the Chernobyl 30 km zone recounts his experience. He found research in the Zone to be poorly organised, encumbered with ideology, hampered by layer upon layer of bureaucracy and conducted in an atmosphere of conflict and mutual suspicion.
(Author) • Martinc, R; Stanic, A [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro) 1977-12-15 RA reactor operation plan was fulfilled, meaning 28583 MWh. In addition to 183 days of operation at full power, during 1977 the reactor was operated for 14 days at lower power level according to the demand of users. The utilization level of rector irradiation capability (neutron flux and time of operation) was 14%. This annex includes detailed statistical data about reactor operation, utilization, power level, savings concerned with new 80% enriched fuel. All the 9 vertical experimental channels were used for irradiation in the reactor core. Digression from the action plan were caused by refueling and demand od the users.
There have been 11 safety shutdowns, of which 6 caused by power cuts, 4 due to failure of the instruments, and 1 due to earthquake in March 1977. [Serbo-Croat] Planirani rad reaktora na nominalnoj snazi ostvaren je u iznosu od 28583 MWh. Godine reaktor je radio 14 dana na manjim snagama i u posebnom eksperimentalnom rezimu na zahtev korisnika. Iskoriscenost kapaciteta reaktora za ozracivanje uzoraka (na bazi neutronskog fluksa i vremena rada reaktora) bila je 41%. Guitar rig 5 metal preset metallica master of puppets bass. Ovaj izvestaj sadrzi detaljne statisticke podatke o radu i iskoriscenosti reaktora, podatke o ustedi goriva prelaskom na 80% obogaceno gorivo.
Korisceno je svih 9 vertikalnih eksperimentalnih kanala u aktivnoj zoni. Uzroci odstupanja od plana rada osim zamene goriva bili su zahtevi korisnika.